back to table of contents
   
title:
 
Risk Management in Process Industry - Practical Approach in Poland
publication:
 
JRACR
volume-issue:   1 - 2
pages:   102 - 105
ISSN:
  2210-8505
DOI:
  doi:10.2991/ijcis.2011.1.2.2 (how to use a DOI)
author(s):
 
Andrzej Kozak
publication date:
 
November 2011
keywords:
 
Risk-based Inspection [RBI], Hazard and Operability Study [HAZOP], life cycle cost [LCC].
abstract:
 
As one of the risk analysis methods HAZOP has been successively and commonly applied for many years since it enables the future user of a process installation to check the project in terms of security in a way that minimises the costs of changes. This paper refers to the weak points of risk management procedures in the process industry which may occur when applying analysis techniques during the plant life cycle and typical common errors made during the HAZOP analysis. A technical assessment of the industrial environment and installations is proposed as a background to RBI procedures.
copyright:
 
© Atlantis Press. This article is distributed under the terms of the Creative Commons Attribution License, which permits non-commercial use, distribution and reproduction in any medium, provided the original work is properly cited.
full text: