Simulation Calculation of Concrete Gravity Dam for Xiyu Reservoir During Operation Period
- DOI
- 10.2991/meic-14.2014.258How to use a DOI?
- Keywords
- Xiyu reservoir; Gravity dam; Operation period; Finite element method; Simulation analysis.
- Abstract
Concrete gravity dam is a common hydraulic structure in order to have a clear understanding for concrete gravity dam in the operating process researching stress and deformation distribution of concrete gravity dam. This paper adopts the universal finite element calculating software to simulate and calculate concrete gravity dam for Xiyu reservoir during operation period, and gives stress and displacement values on the typical section of gravity dam under the condition during operation period, and analyses calculation results, research results can provides certain theoretical basis for design and construction of concrete gravity dam. The results showed that, in the operating process, stress and deformation values of concrete gravity dam for Xiyu reservoir mainly related to water pressure and earthquake action, but the dam’s stress and deformation values are smaller, the stress and deformation values can meet strength and stiffness requirements.
- Copyright
- © 2014, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Dongyu Ji AU - Chuncao Song PY - 2014/11 DA - 2014/11 TI - Simulation Calculation of Concrete Gravity Dam for Xiyu Reservoir During Operation Period BT - Proceedings of the 2014 International Conference on Mechatronics, Electronic, Industrial and Control Engineering PB - Atlantis Press SP - 1157 EP - 1160 SN - 2352-5401 UR - https://doi.org/10.2991/meic-14.2014.258 DO - 10.2991/meic-14.2014.258 ID - Ji2014/11 ER -