Evaluation about Passenger Satisfaction Degree of Wuhan-Guangzhou High-speed Rail Based on SPA
- DOI
- 10.2991/mmat.2013.35How to use a DOI?
- Keywords
- Set Pair Analysis, Satisfaction degree, Wuhan-Guangzhou high-speed rail.
- Abstract
As far as Wuhan-Guangzhou high-speed rail put in operation, except for holidays, the passenger load rate is low, facing huge market risk. This paper explores the passenger satisfaction of Wuhan-Guangzhou high-speed rail, based on SPA(Set Pair Analysis) theory and combined with practice. To analyze the impact factors of passenger satisfaction, a in-depth investigations was made on Wuhan-Guangzhou high-speed rail. After the investigations, the date collected is processed by software named SPSS. Then, through using the method of SPA, passenger satisfaction evaluation model is built. Therefore, we can estimate the passenger satisfaction levels of Wuhan-Guangzhou high-speed rail by the model. The results can provide a reference for the management of Wuhan-Guangzhou high-speed rail, but also a basis for scientific decisions.
- Copyright
- © 2013, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Wenfen Zhang AU - Jiaqi Yang PY - 2012/11 DA - 2012/11 TI - Evaluation about Passenger Satisfaction Degree of Wuhan-Guangzhou High-speed Rail Based on SPA BT - Proceedings of the 2012 International Conference on Automobile and Traffic Science, Materials and Metallurgy Engineering PB - Atlantis Press SP - 181 EP - 186 SN - 1951-6851 UR - https://doi.org/10.2991/mmat.2013.35 DO - 10.2991/mmat.2013.35 ID - Zhang2012/11 ER -