Cost analysis and risk supervision of project in electric power construction

Authors
Zheng Gu, Tianqi Lu, Qiang Ma
Corresponding Author
Zheng Gu
Available Online November 2016.
DOI
10.2991/msetasse-16.2016.332How to use a DOI?
Keywords
project cost; electric power construction; electric power enterprise; cost analysis; risk monitoring
Abstract

At present, the project cost management of most electric power construction enterprises remains in the following way: the Finance Department will judge the surplus-deficit status of the engineering in accordance with the income from engineering settlement and actual cost of engineering and make evaluation after the completion of the engineering and end of settlement. As most construction projects of the electric power construction enterprise are such state-invested projects as power plant, more investment is required and the construction period is longer and it is harder to manage than that of general engineering projects. Therefore, the method for cost analysis and risk supervision of project in electric power construction is discussed in the Thesis. Firstly, analysis is made on the cost risk of engineering project and systematic and dynamic method is adopted for the comprehensive management of the cost risk of engineering project; secondly, as the quality of technical scheme for construction influences the construction cost, scientific and advanced technology is adopted during the construction to improve construction quality and speed up construction progress; finally, project management and risk management are implemented based on the cost control of engineering project to reduce cost and achieve the maximum economic benefits and social benefits of the engineering project.

Copyright
© 2016, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Download article (PDF)

Volume Title
Proceedings of the 2016 4th International Conference on Management Science, Education Technology, Arts, Social Science and Economics (msetasse-16)
Series
Advances in Social Science, Education and Humanities Research
Publication Date
November 2016
ISBN
978-94-6252-263-3
ISSN
2352-5398
DOI
10.2991/msetasse-16.2016.332How to use a DOI?
Copyright
© 2016, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Cite this article

TY  - CONF
AU  - Zheng Gu
AU  - Tianqi Lu
AU  - Qiang Ma
PY  - 2016/11
DA  - 2016/11
TI  - Cost analysis and risk supervision of project in electric power construction
BT  - Proceedings of the 2016 4th International Conference on Management Science, Education Technology, Arts, Social Science and Economics (msetasse-16)
PB  - Atlantis Press
SP  - 1544
EP  - 1547
SN  - 2352-5398
UR  - https://doi.org/10.2991/msetasse-16.2016.332
DO  - 10.2991/msetasse-16.2016.332
ID  - Gu2016/11
ER  -