Proceedings of the 2022 International Conference on Computer Science, Information Engineering and Digital Economy (CSIEDE 2022)

BIM Based Construction Project Budget Management

Authors
Shu Zong1, *, Peng Liu1, Minze Li1
1Jin qiao College of Kunming University of Technology, Kunming, Yunnan, China
*Corresponding author. Email: 928288652@qq.com
Corresponding Author
Shu Zong
Available Online 30 December 2022.
DOI
10.2991/978-94-6463-108-1_65How to use a DOI?
Keywords
BIM Technology; Construction Engineering; Budget Management; Cost Budget
Abstract

The use of computer construction engineering budget has great practical research value. Construction engineering projects, from investment to estimation, bidding to final cost settlement, are finally integrated into a comprehensive system to form an integrated system for construction project budget management become a very important direction for future development. In order to solve the shortcomings of the existing construction engineering budget research, this paper discusses the functional equation of construction engineering value inspection, the BIM budget management value and the characteristics of engineering budget data, aiming at the project of BIM based construction engineering budget management. The overview and project list are briefly introduced. And design and discuss the cost budget process of BIM based construction project budget management, and finally discuss the accuracy and manual calculation and manual calculation of the budget book for reinforced, concrete, decorative and metal structures in A construction project. The Excel method is used for comparative experimental tests. The experimental data show that the accuracy rate of budget book configuration in BIM based construction projectbudget is higher than that of manual calculation and Excel method. The accuracy rate of budget book configuration in steel, concrete, decorative and metal structures the middle BIM reached more than 96%, while the manual calculation and Excel were lower than 92%, thus verifying the superiority of the BIM based construction project budget management application.

Copyright
© 2022 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Download article (PDF)

Volume Title
Proceedings of the 2022 International Conference on Computer Science, Information Engineering and Digital Economy (CSIEDE 2022)
Series
Advances in Computer Science Research
Publication Date
30 December 2022
ISBN
10.2991/978-94-6463-108-1_65
ISSN
2352-538X
DOI
10.2991/978-94-6463-108-1_65How to use a DOI?
Copyright
© 2022 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Cite this article

TY  - CONF
AU  - Shu Zong
AU  - Peng Liu
AU  - Minze Li
PY  - 2022
DA  - 2022/12/30
TI  - BIM Based Construction Project Budget Management
BT  - Proceedings of the 2022 International Conference on Computer Science, Information Engineering and Digital Economy (CSIEDE 2022)
PB  - Atlantis Press
SP  - 575
EP  - 583
SN  - 2352-538X
UR  - https://doi.org/10.2991/978-94-6463-108-1_65
DO  - 10.2991/978-94-6463-108-1_65
ID  - Zong2022
ER  -