Proceedings of the 5th FIRST T1 T2 2021 International Conference (FIRST-T1-T2 2021)

Biogas and Electrical Energy Production from Market Waste at Fixed Dome Bio-digester in Talang Banjar Jambi

Authors
Leila Kalsum1, *, Yordan Hasan2, Rusdianasari, Rusdianasari1, Aida Syarif1, Dayaningrat Dayaningrat1, Syaiful M1
1Renewable Energy Study Program, Sriwijaya State Polytechnic, Palembang Indonesia
2Electronic Engineering Sriwijaya State Polytechnic, Palembang Indonesia
*Corresponding author. Email: leila_k@polsri.ac.id
Corresponding Author
Leila Kalsum
Available Online 14 February 2022.
DOI
10.2991/ahe.k.220205.034How to use a DOI?
Keywords
Organic waste; fixed dome digester; biogas; electrical energy
Abstract

The waste problem commonly is almost the same in every big city. When it is not managed properly, it will be piled up very quickly. The city of Jambi produces approximately 1,838.48 m3/day of waste. Organic waste originating from market waste in Jambi City is dominated by vegetable waste, so that its organic content can be converted into biogas energy. This abundant of waste is managed in Talang Banjar in Jambi City which is to be converted into biogas in order to reduce environmental pollution and also convert organic waste into useful materials what it is so called biogas that can be used by the community. This waste treatment used a fixed-dome type bio-digester. The purpose of the study was to analyze the production of biogas and electrical energy generated from waste processing at a fixed-dome bio-digester in Talang Banjar Jambi. Based on the results of the study, it found out that the average methane gas content produced was above 60% with an average biogas volume of 5 m3/hour, and the electrical energy produced 58.5 kWh/hour.

Copyright
© 2022 The Authors. Published by Atlantis Press International B.V.
Open Access
This is an open access article under the CC BY-NC license.

Download article (PDF)

Volume Title
Proceedings of the 5th FIRST T1 T2 2021 International Conference (FIRST-T1-T2 2021)
Series
Atlantis Highlights in Engineering
Publication Date
14 February 2022
ISBN
10.2991/ahe.k.220205.034
ISSN
2589-4943
DOI
10.2991/ahe.k.220205.034How to use a DOI?
Copyright
© 2022 The Authors. Published by Atlantis Press International B.V.
Open Access
This is an open access article under the CC BY-NC license.

Cite this article

TY  - CONF
AU  - Leila Kalsum
AU  - Yordan Hasan
AU  - Rusdianasari, Rusdianasari
AU  - Aida Syarif
AU  - Dayaningrat Dayaningrat
AU  - Syaiful M
PY  - 2022
DA  - 2022/02/14
TI  - Biogas and Electrical Energy Production from Market Waste at Fixed Dome Bio-digester in Talang Banjar Jambi
BT  - Proceedings of the 5th FIRST T1 T2 2021 International Conference (FIRST-T1-T2 2021)
PB  - Atlantis Press
SP  - 197
EP  - 200
SN  - 2589-4943
UR  - https://doi.org/10.2991/ahe.k.220205.034
DO  - 10.2991/ahe.k.220205.034
ID  - Kalsum2022
ER  -