Proceedings of the 2022 4th International Conference on Economic Management and Cultural Industry (ICEMCI 2022)

Brief Discussion on Construction Cost Control of Engineering Projects

Authors
Zeshaung Liu1, Xiaomeng Li1, *
1Xi′an University of Technology, Xi′an, Shaanxi, 710054, China
*Corresponding author. Email: 1137735960@qq.com
Corresponding Author
Xiaomeng Li
Available Online 27 December 2022.
DOI
10.2991/978-94-6463-098-5_68How to use a DOI?
Keywords
Engineering project; Construction cost control; COSO internal cost control system
Abstract

For construction companies, the control of construction costs during the construction of engineering projects determines whether most companies can well achieve their established profit goals. The lack of a complete cost control system and a sound cost control system is the root cause of the poor construction cost control of construction enterprises, which is also a problem for most enterprises. This article combines the COSO internal control system to conduct a simple analysis of the construction cost of the project from five aspects: control environment, risk assessment, control activities, information and communication, and internal supervision, and proposes some reasonable solutions to the problems.

Copyright
© 2023 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Download article (PDF)

Volume Title
Proceedings of the 2022 4th International Conference on Economic Management and Cultural Industry (ICEMCI 2022)
Series
Advances in Economics, Business and Management Research
Publication Date
27 December 2022
ISBN
10.2991/978-94-6463-098-5_68
ISSN
2352-5428
DOI
10.2991/978-94-6463-098-5_68How to use a DOI?
Copyright
© 2023 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Cite this article

TY  - CONF
AU  - Zeshaung Liu
AU  - Xiaomeng Li
PY  - 2022
DA  - 2022/12/27
TI  - Brief Discussion on Construction Cost Control of Engineering Projects
BT  - Proceedings of the 2022 4th International Conference on Economic Management and Cultural Industry (ICEMCI 2022)
PB  - Atlantis Press
SP  - 599
EP  - 605
SN  - 2352-5428
UR  - https://doi.org/10.2991/978-94-6463-098-5_68
DO  - 10.2991/978-94-6463-098-5_68
ID  - Liu2022
ER  -