Proceedings of the 3rd International Conference on Management Science and Software Engineering (ICMSSE 2023)

Practice and application of bim based carbon neutral temporary construction facility in UHV power grid project

Authors
Weijie Jiang1, *, Bin Xu1, Haojie Zhang1, Hyperplasia Zhang1, Shu Wang1
1Construction Branch of State Grid Zhejiang Electric Power Co., LTD, Hangzhou, 310000, China
*Corresponding author. Email: 597101904@qq.com
Corresponding Author
Weijie Jiang
Available Online 9 October 2023.
DOI
10.2991/978-94-6463-262-0_50How to use a DOI?
Keywords
BIM technology; Carbon neutral; Temporary construction; Uhv project
Abstract

With the development of low-carbon economy, carbon neutrality has become a widely concerned topic. As an important infrastructure related to national economic security and social development, the energy consumption and greenhouse gas emissions in the construction of UHV power grid project have been paid more and more attention. Therefore, this paper aims to explore the application of BIM based carbon neutral temporary construction facilities in UHV power grid projects. This paper first introduces the basic situation of UHV power grid engineering, including its importance, current situation and development trend. Then, aiming at the problems of energy consumption and greenhouse gas emissions existing in the construction process of UHV power grid project, this paper puts forward the application scheme of carbon neutral temporary construction facilities based on BIM technology. The program mainly includes the following four aspects: energy monitoring, energy management, carbon neutrality and energy conservation and emission reduction. In this paper, the concrete realization methods and technical principles of these four links are introduced respectively, and the practical cases are expounded in detail. Finally, the advantages and application prospects of BIM carbon neutral temporary construction facilities are analyzed and evaluated in this paper. It is found that this scheme can effectively reduce the energy consumption and greenhouse gas emissions during the construction of UHV power grid project, and also improve the sustainability and economic benefits of the project construction. Therefore, this paper believes that the application scheme of carbon neutral temporary construction facilities based on BIM technology will be an important development direction of UHV power grid construction, with broad market prospects and application value. In summary, this paper conducts an in-depth study on the application of BIM based carbon neutral temporary construction facilities in UHV power grid projects, puts forward corresponding application schemes, and analyzes and evaluates its advantages and application prospects. It is hoped that this study can be used as a reference for the low-carbon development of other engineering construction fields.

Copyright
© 2024 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Download article (PDF)

Volume Title
Proceedings of the 3rd International Conference on Management Science and Software Engineering (ICMSSE 2023)
Series
Atlantis Highlights in Engineering
Publication Date
9 October 2023
ISBN
10.2991/978-94-6463-262-0_50
ISSN
2589-4943
DOI
10.2991/978-94-6463-262-0_50How to use a DOI?
Copyright
© 2024 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Cite this article

TY  - CONF
AU  - Weijie Jiang
AU  - Bin Xu
AU  - Haojie Zhang
AU  - Hyperplasia Zhang
AU  - Shu Wang
PY  - 2023
DA  - 2023/10/09
TI  - Practice and application of bim based carbon neutral temporary construction facility in UHV power grid project
BT  - Proceedings of the 3rd International Conference on Management Science and Software Engineering (ICMSSE 2023)
PB  - Atlantis Press
SP  - 472
EP  - 485
SN  - 2589-4943
UR  - https://doi.org/10.2991/978-94-6463-262-0_50
DO  - 10.2991/978-94-6463-262-0_50
ID  - Jiang2023
ER  -