Risk Management at the Enterprises of Subsoil Use
- DOI
- 10.2991/aebmr.k.200324.178How to use a DOI?
- Keywords
- risks, hazards, threats, industrial safety, risk management, “man–machine” system, reliability, prevention, damage insurance
- Abstract
Industrial safety at the enterprises of the mineral resources complex is ensured by the methods of the theory of reliability of the “man-machine”system. This forms a risk-based approach to industrial safety. The risk-based approach is based on preventive measures aimed at ensuring the reliability of the system, its human and technical components. At the same time, the key components of the production activity of the enterprise such as human and technical ones are studied. The article substantiates the position that the reliability of production and commercial activities of the enterprise is determined by the reliability of the functioning of all production factors in in the economic process, i.e. material factors and human capital. The authors identified both external and internal factors that need to be considered in industrial safety management. Particular emphasis is placed on the systematization of risks and the need to minimize them using the tools of probability theory based on conceptual theory of reliability. In this case, control actions in the form of preventive measures in the functioning of the economic system of the enterprise play an important role.
- Copyright
- © 2020, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - M.M. Khaykin AU - L.A. Makhova AU - O.A. Kochergina PY - 2020 DA - 2020/03/30 TI - Risk Management at the Enterprises of Subsoil Use BT - Proceedings of the “New Silk Road: Business Cooperation and Prospective of Economic Development” (NSRBCPED 2019) PB - Atlantis Press SP - 973 EP - 976 SN - 2352-5428 UR - https://doi.org/10.2991/aebmr.k.200324.178 DO - 10.2991/aebmr.k.200324.178 ID - Khaykin2020 ER -