Proceedings of the 2016 International Conference on Artificial Intelligence and Engineering Applications

Distribution Network Planning Evaluation Considering Risk Cost

Authors
Jianwei Xu, Haifeng Su, Zhirui Liang
Corresponding Author
Jianwei Xu
Available Online November 2016.
DOI
10.2991/aiea-16.2016.32How to use a DOI?
Keywords
Distribution Network, Planning, Life Cycle Cost, Risk.
Abstract

There are many uncertain factors that affect the planning of power network, and these uncertain risk factors appear in all stages of the life cycle. The uncertainty of load and electricity price directly affects the whole life cycle cost of the plan. In the whole life cycle cost calculation of power system planning, the uncertainty of load and electricity price is included, so that the whole life cycle cost evaluation of power system planning is more reasonable.

Copyright
© 2016, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Download article (PDF)

Volume Title
Proceedings of the 2016 International Conference on Artificial Intelligence and Engineering Applications
Series
Advances in Computer Science Research
Publication Date
November 2016
ISBN
10.2991/aiea-16.2016.32
ISSN
2352-538X
DOI
10.2991/aiea-16.2016.32How to use a DOI?
Copyright
© 2016, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Cite this article

TY  - CONF
AU  - Jianwei Xu
AU  - Haifeng Su
AU  - Zhirui Liang
PY  - 2016/11
DA  - 2016/11
TI  - Distribution Network Planning Evaluation Considering Risk Cost
BT  - Proceedings of the 2016 International Conference on Artificial Intelligence and Engineering Applications
PB  - Atlantis Press
SP  - 172
EP  - 175
SN  - 2352-538X
UR  - https://doi.org/10.2991/aiea-16.2016.32
DO  - 10.2991/aiea-16.2016.32
ID  - Xu2016/11
ER  -