Proceedings of the 2022 3rd International Conference on Big Data Economy and Information Management (BDEIM 2022)

Research on Capacity Compensation Mechanism Based on Fixed Investment Cost of Power Generation Enterprises

Authors
Ran Chen1, *, Bingni Chen2
1Kunming Power Exchange Center Co. Ltd., Kunming, 650000, China
2Insigma Hengtian Software Ltd., Hangzhou, 310000, China
*Corresponding author. Email: crandy@foxmail.com
Corresponding Author
Ran Chen
Available Online 29 March 2023.
DOI
10.2991/978-94-6463-124-1_81How to use a DOI?
Keywords
capacity compensation; fixed investment cost; power station
Abstract

With the increase of the proportion of renewable energy and the promotion of spot market, the fixed cost recovery of thermal power enterprises faces greater difficulties and the willingness to invest in power generation decreases, which brings risks to the safe and reliable operation of the power grid and the healthy and orderly development of the market. This paper proposes a capacity compensation method based on the fixed investment cost of power station, which can provide a simple and easy-to-operate compensation scheme for the fixed investment cost recovery of power generation enterprises. Since the revenue already earned by power enterprises is deducted from the capacity compensation cost, it can effectively avoid the problem of over-compensation to power generation enterprises and realize the linkage between capacity compensation revenue and real-time market revenue.

Copyright
© 2023 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Download article (PDF)

Volume Title
Proceedings of the 2022 3rd International Conference on Big Data Economy and Information Management (BDEIM 2022)
Series
Advances in Economics, Business and Management Research
Publication Date
29 March 2023
ISBN
10.2991/978-94-6463-124-1_81
ISSN
2352-5428
DOI
10.2991/978-94-6463-124-1_81How to use a DOI?
Copyright
© 2023 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Cite this article

TY  - CONF
AU  - Ran Chen
AU  - Bingni Chen
PY  - 2023
DA  - 2023/03/29
TI  - Research on Capacity Compensation Mechanism Based on Fixed Investment Cost of Power Generation Enterprises
BT  - Proceedings of the 2022 3rd International Conference on Big Data Economy and Information Management (BDEIM 2022)
PB  - Atlantis Press
SP  - 710
EP  - 716
SN  - 2352-5428
UR  - https://doi.org/10.2991/978-94-6463-124-1_81
DO  - 10.2991/978-94-6463-124-1_81
ID  - Chen2023
ER  -