Research on Adjustment in Contract Sum Caused by Missing of Preliminaries in BQ for Tendering

Authors
Ling Yan, Qianxing Ding, Min Yan
Corresponding Author
Ling Yan
Available Online November 2015.
DOI
10.2991/emeeit-15.2015.19How to use a DOI?
Keywords
BQ for tendering Missing of preliminaries Responsibility of risk; Adjustment conditions; Adjustment method
Abstract

There is a focus that controversy often appears between both sides of employers and contractors in BQ for tendering during construction. Aim at the problem of adjustment of the missing in BQ for tendering, this paper elaborate from two aspects, including the reason and adjustment method. Through analyzing the reasons to divide responsibility of risk on the basis of Code of bills of quantities and valuation for construction works (GB50500-2013). Based on the above analysis defining the adjustment conditions of the missing in BQ for tendering .In terms of adjustment method, divide preliminaries into three categories. It will provide the theory evidence for both sides of employers and contractors to adjust the agreement during construction.

Copyright
© 2015, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Download article (PDF)

Volume Title
Proceedings of the 2015 International conference on Engineering Management, Engineering Education and Information Technology
Series
Advances in Computer Science Research
Publication Date
November 2015
ISBN
10.2991/emeeit-15.2015.19
ISSN
2352-538X
DOI
10.2991/emeeit-15.2015.19How to use a DOI?
Copyright
© 2015, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Cite this article

TY  - CONF
AU  - Ling Yan
AU  - Qianxing Ding
AU  - Min Yan
PY  - 2015/11
DA  - 2015/11
TI  - Research on Adjustment in Contract Sum Caused by Missing of Preliminaries in BQ for Tendering
BT  - Proceedings of the 2015 International conference on Engineering Management, Engineering Education and Information Technology
PB  - Atlantis Press
SP  - 90
EP  - 93
SN  - 2352-538X
UR  - https://doi.org/10.2991/emeeit-15.2015.19
DO  - 10.2991/emeeit-15.2015.19
ID  - Yan2015/11
ER  -