Analysis of the Failure of Backup Automatic Switch in Substation
Authors
Yongbo Yang, Hao Zhong, Hezhe Wang, Xiaodong Gu, Kai Wang, Yaguang Zhang, Xiaobing Wang, Xiaofei Huang
Corresponding Author
Yongbo Yang
Available Online April 2016.
- DOI
- https://doi.org/10.2991/emim-16.2016.238How to use a DOI?
- Keywords
- Backup automatic switch; Action logic; Substation
- Abstract
- Backup automatic switch is widely used in low-voltage power supply network, which is a kind of economic and effective technical measures to provide uninterrupted power supply to the consumer. The use of Backup automatic switch in the power grid is a powerful technical means to ensure the safe, stable and reliable operation of power network. But by needs of power grid operation constraints, backup automatic switch in the grid application will often encounter some problems, such as coordination with automatic re-closing, charge and discharge of backup automatic switch and other issues. These problems affect the backup automatic switch to play a positive role. An 110kV transformer substation backup automatic switch action failure reasons are analyzed and discussed in this paper. The logic of action analysis, it proposed three kinds of projects with different principle, to provide a basis for the preparation of similar situations in the power grid.
- Open Access
- This is an open access article distributed under the CC BY-NC license.
Cite this article
TY - CONF AU - Yongbo Yang AU - Hao Zhong AU - Hezhe Wang AU - Xiaodong Gu AU - Kai Wang AU - Yaguang Zhang AU - Xiaobing Wang AU - Xiaofei Huang PY - 2016/04 DA - 2016/04 TI - Analysis of the Failure of Backup Automatic Switch in Substation BT - 6th International Conference on Electronic, Mechanical, Information and Management Society PB - Atlantis Press SP - 1166 EP - 1170 SN - 2352-538X UR - https://doi.org/10.2991/emim-16.2016.238 DO - https://doi.org/10.2991/emim-16.2016.238 ID - Yang2016/04 ER -