Post Impact Evaluation On Jiangsu Inland Waterway Infrastructure Projects
Authors
Zhenyu Liu, Xiaojian Wang
Corresponding Author
Zhenyu Liu
Available Online April 2016.
- DOI
- https://doi.org/10.2991/emim-16.2016.248How to use a DOI?
- Keywords
- Inland waterway infrastructure;Indicator system;Post-evaluation project;Gray cluster analysis
- Abstract
- On considering of the current study of Jiangsu inland waterway infrastructure construction projects and the features of these projects, this study put an indicator system on post-evaluation work of inland waterway infrastructure construction based on their overall thoughts. The indicator systems were made through four parts of the projects, construction process, economic effectiveness, engineering effeteness and sustainable development, and relative post-evaluation methods were given. For there’s more qualitative evaluation indexes and the incompetence of the data, the grey fuzzy evaluation method was used in this study. With an improved method on the existing endpoints triangular whitenization weight function and center triangular whitenization weight function, center triangular whitenization weight function became more scientific and reasonable. The study has been used in the post-evaluation project of level-3 waterway regulation project of Sunan Canal (Wuxi Section).
- Open Access
- This is an open access article distributed under the CC BY-NC license.
Cite this article
TY - CONF AU - Zhenyu Liu AU - Xiaojian Wang PY - 2016/04 DA - 2016/04 TI - Post Impact Evaluation On Jiangsu Inland Waterway Infrastructure Projects BT - 6th International Conference on Electronic, Mechanical, Information and Management Society PB - Atlantis Press SP - 1212 EP - 1215 SN - 2352-538X UR - https://doi.org/10.2991/emim-16.2016.248 DO - https://doi.org/10.2991/emim-16.2016.248 ID - Liu2016/04 ER -