OCCI And PSO-based Optimization And Management System for Grid Maintenance Scheduling
Authors
Qian Liu, Wenying Liu, Guohua Gao
Corresponding Author
Qian Liu
Available Online March 2013.
- DOI
- https://doi.org/10.2991/iccsee.2013.213How to use a DOI?
- Keywords
- Intelligent Dispatching, Maintenance Scheduling, Optimization Methodology, OCCI, PSO
- Abstract
- Smart grid is an inevitable choice for the future development of the grid. Smart scheduling is one of the cores to build the strong and smart grid in China. Optimization and Management System for Grid Maintenance Scheduling is an in-depth exploration to achieve dispatching digitalization, intellectualization and visualization. This paper gives a rather detailed description about the functionality and implementation of Optimization and Management System for Grid Maintenance Scheduling. With received maintenance schedules as the basic data, OCCI-based data processing techniques and PSO-based optimization methodology are adopted to achieve the standardization and intellectualization of the grid maintenance scheduling. Moreover, the maintenance schedules generated and related information are managed in a standardized way. The design from this paper together with its programs has been applied in practice, achieving satisfying effect.
- Open Access
- This is an open access article distributed under the CC BY-NC license.
Cite this article
TY - CONF AU - Qian Liu AU - Wenying Liu AU - Guohua Gao PY - 2013/03 DA - 2013/03 TI - OCCI And PSO-based Optimization And Management System for Grid Maintenance Scheduling BT - Conference of the 2nd International Conference on Computer Science and Electronics Engineering (ICCSEE 2013) PB - Atlantis Press SP - 848 EP - 851 SN - 1951-6851 UR - https://doi.org/10.2991/iccsee.2013.213 DO - https://doi.org/10.2991/iccsee.2013.213 ID - Liu2013/03 ER -