Proceedings of the 2014 International Conference on Mechanics and Civil Engineering

The Dredging Layout Scheme Research of Xigang Channel in Dongliu Waterway

Authors
Liang SHU
Corresponding Author
Liang SHU
Available Online December 2014.
DOI
10.2991/icmce-14.2014.106How to use a DOI?
Keywords
Dongliu Waterway, Mathematical Model, Xigang Waterway, Dredging Scheme
Abstract

In order to determine reasonable channel layout and maintenance the dredging areas, this paper set up mathematics model of two-dimensional water flow for channel, and the numerical simulation results are verified by the observed data. Based on this, the fluid field change laws of Xigang channel in flood, median and low water levels are analyzed, the dredging layout scheme of Xigang channel is proposed, and the water velocity changes in Xigang channel before and after dredging maintenance are compared. The results show that the following dredging layout scheme is reasonable, the entrance of Xigang channel is located at main flow area of Dongliu waterway, the left border line of Xigang channel is close to the channel regulation project and the main channel from Tiansha islet to the downstream, the right boundary will depend on the wide requirements of the channel, and the channel outlet can smoothly connect to water flow

Copyright
© 2014, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Download article (PDF)

Volume Title
Proceedings of the 2014 International Conference on Mechanics and Civil Engineering
Series
Advances in Engineering Research
Publication Date
December 2014
ISBN
10.2991/icmce-14.2014.106
ISSN
2352-5401
DOI
10.2991/icmce-14.2014.106How to use a DOI?
Copyright
© 2014, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Cite this article

TY  - CONF
AU  - Liang SHU
PY  - 2014/12
DA  - 2014/12
TI  - The Dredging Layout Scheme Research of Xigang Channel in Dongliu Waterway
BT  - Proceedings of the 2014 International Conference on Mechanics and Civil Engineering
PB  - Atlantis Press
SP  - 605
EP  - 610
SN  - 2352-5401
UR  - https://doi.org/10.2991/icmce-14.2014.106
DO  - 10.2991/icmce-14.2014.106
ID  - SHU2014/12
ER  -