The Establishment of Objective Performance Evaluation System for PPP Project Considering the Influence of Factors between Indicators(1)

Authors
Xuyi Zhang, Jihkuang Chen
Corresponding Author
Xuyi Zhang
Available Online October 2018.
DOI
10.2991/icmcs-18.2018.112How to use a DOI?
Keywords
PPP Project; Entropy Method; DEMATEL
Abstract

The construction of public infrastructure and public affairs management requires a lot of capital investment, which will lead to excessive financial burden on the government. Therefore, the Public-Private Partnership (PPP) is increasingly being introduced into public construction and operations. In the past related research, most of the PPP project performance indicators based on key performance indicators or balanced scorecards were in line with the life cycle of PPP projects, then estimated the importance of indicators through methods such as AHP (Analytic Hierarchy Process) or factor analysis, however it lacks objectivity and ignores the interaction between indicators. This paper quotes the DEMATEL method to analyze the influence between indicators, and further integrates and corrects the final weights to establish a relatively complete PPP performance evaluation system.

Copyright
© 2018, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Download article (PDF)

Volume Title
Proceedings of the 8th International Conference on Management and Computer Science (ICMCS 2018)
Series
Advances in Computer Science Research
Publication Date
October 2018
ISBN
10.2991/icmcs-18.2018.112
ISSN
2352-538X
DOI
10.2991/icmcs-18.2018.112How to use a DOI?
Copyright
© 2018, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Cite this article

TY  - CONF
AU  - Xuyi Zhang
AU  - Jihkuang Chen
PY  - 2018/10
DA  - 2018/10
TI  - The Establishment of Objective Performance Evaluation System for PPP Project Considering the Influence of Factors between Indicators(1)
BT  - Proceedings of the 8th International Conference on Management and Computer Science (ICMCS 2018)
PB  - Atlantis Press
SP  - 545
EP  - 549
SN  - 2352-538X
UR  - https://doi.org/10.2991/icmcs-18.2018.112
DO  - 10.2991/icmcs-18.2018.112
ID  - Zhang2018/10
ER  -