Design Study for Key Components of Slurry TBM in Tunnel with High Pressure Water
Authors
Yuefeng Yin1, *, Ti Zhang2, Kunpeng Chen1
1China Railway Engineering Equipment Group Co., Ltd, Zhengzhou, 450016, China
2Henan Economics & Management School, Nanyang, 473000, China
*Corresponding author.
Email: yuefeng510@163.com
Corresponding Author
Yuefeng Yin
Available Online 9 October 2023.
- DOI
- 10.2991/978-94-6463-256-9_112How to use a DOI?
- Keywords
- Slurry TBM; Cutterhead; Main Drive; Thrust System; Over-excavation
- Abstract
Taking an Italian tunnel project with high pressure water as an example, this paper analyses and researches the sslurry TBM’s key components such as cutterhead, main drive and thrust system for large overburden tunnel and high hydrostatic stratum by combining the probability analysis of geological data, and by this way derives its theoretical design basis, aiming to provide some theoretical basis on the tunnel projects and reference for the design of subsequent projects.
- Copyright
- © 2024 The Author(s)
- Open Access
- Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.
Cite this article
TY - CONF AU - Yuefeng Yin AU - Ti Zhang AU - Kunpeng Chen PY - 2023 DA - 2023/10/09 TI - Design Study for Key Components of Slurry TBM in Tunnel with High Pressure Water BT - Proceedings of the 2023 4th International Conference on Management Science and Engineering Management (ICMSEM 2023) PB - Atlantis Press SP - 1122 EP - 1129 SN - 2352-5428 UR - https://doi.org/10.2991/978-94-6463-256-9_112 DO - 10.2991/978-94-6463-256-9_112 ID - Yin2023 ER -