Proceedings of the 2022 2nd International Conference on Management Science and Software Engineering (ICMSSE 2022)

Cost calculation method and application of GIS equipment in substation based on asset life cycle management theory

Authors
Shan Jiang1, Ran Chen1, Yingbo Zhou1, Li Zhu2, 2, *, Jian Qi2
1Economic and Technological Research Institute of Hubei Electric Power Co.,Ltd, Xudong Street, Wuhan, China
2Xiangyang Chengzhi Power Design Co.,Ltd, Xiangyang, China
*Corresponding author. Email: 394142608@qq.com
Corresponding Author
Li Zhu
Available Online 29 December 2022.
DOI
10.2991/978-94-6463-056-5_100How to use a DOI?
Keywords
Asset life cycle management; substation; maintenance cost
ABSTRACT

With the continuous advancement of the construction of smart grids, new situations, new demands and new development models have put forward higher requirements for substations, which are important supporting nodes of the power grid. In this paper, the implementation of asset life cycle management in substation engineering projects is to conduct overall and entire process management of all stages and activities in the asset life cycle of substation engineering projects. Starting from the overall project, reflecting the requirements of the entire life cycle of the project, it not only includes the goals of the construction period, but also pays more attention to the operation phase of the project, and highlights the overall efficiency and benefits of project management. Life cycle cost theory can indeed achieve good effects such as reducing the life cycle cost of substation engineering and improving reliability.

Copyright
© 2023 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Download article (PDF)

Volume Title
Proceedings of the 2022 2nd International Conference on Management Science and Software Engineering (ICMSSE 2022)
Series
Atlantis Highlights in Computer Sciences
Publication Date
29 December 2022
ISBN
10.2991/978-94-6463-056-5_100
ISSN
2589-4900
DOI
10.2991/978-94-6463-056-5_100How to use a DOI?
Copyright
© 2023 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Cite this article

TY  - CONF
AU  - Shan Jiang
AU  - Ran Chen
AU  - Yingbo Zhou
AU  - Li Zhu
AU  - Jian Qi
PY  - 2022
DA  - 2022/12/29
TI  - Cost calculation method and application of GIS equipment in substation based on asset life cycle management theory
BT  - Proceedings of the 2022 2nd International Conference on Management Science and Software Engineering (ICMSSE 2022)
PB  - Atlantis Press
SP  - 688
EP  - 695
SN  - 2589-4900
UR  - https://doi.org/10.2991/978-94-6463-056-5_100
DO  - 10.2991/978-94-6463-056-5_100
ID  - Jiang2022
ER  -