Proceedings of the 2014 International Conference on Physics

Verification on Delay Time Adequacy of RSG GAS (Reaktor Serba Guna - G.A. Siwabessy) Control Elements

Authors
Azizul Khakim
Corresponding Author
Azizul Khakim
Available Online October 2014.
DOI
https://doi.org/10.2991/icp-14.2014.22How to use a DOI?
Keywords
Delay time; control element; dropping time; instrumentation response.
Abstract
The capability of control elements to manage the reactor operation does not merely relay on their negative reactivity worth, but also the speed required to shutdown the reactor when operation state leads to an accident condition. The response speed of control elements is characterized by delay time which comprises of instrumentation response and dropping time. The adequacy verification on delay time was performed against fast reactivity transient due to inadvertant control rod withdrawal by observing safety parameters at peak power. Three delay times were analized using PARET/ANL code for fast reactivity transients. The calculation results confirmed that the delay time may not exceed 0.5 s.
Open Access
This is an open access article distributed under the CC BY-NC license.

Download article (PDF)

Proceedings
International Conference on Physics 2014 (ICP-14)
Part of series
Advances in Physics Research
Publication Date
October 2014
ISBN
978-94-62520-38-7
ISSN
2352-541X
DOI
https://doi.org/10.2991/icp-14.2014.22How to use a DOI?
Open Access
This is an open access article distributed under the CC BY-NC license.

Cite this article

TY  - CONF
AU  - Azizul Khakim
PY  - 2014/10
DA  - 2014/10
TI  - Verification on Delay Time Adequacy of RSG GAS (Reaktor Serba Guna - G.A. Siwabessy) Control Elements
BT  - International Conference on Physics 2014 (ICP-14)
PB  - Atlantis Press
SN  - 2352-541X
UR  - https://doi.org/10.2991/icp-14.2014.22
DO  - https://doi.org/10.2991/icp-14.2014.22
ID  - Khakim2014/10
ER  -