The Application of Hot Water Flow Method for Checking the Water Circuit Within the Winding of Turbo Generator
Authors
Ming Li, Andong Wang, Zhiwei Cao, Fuchun Sun, Shanhua Sun, Guangke Xu, Weiwei Zhang, Changling Wang
Corresponding Author
Ming Li
Available Online December 2016.
- DOI
- 10.2991/icseee-16.2016.20How to use a DOI?
- Keywords
- hot water flow method, winding of turbo generator, water circuit, flow, temperature
- Abstract
The hot water flow method, which has been gradually applied, is very useful for Checking the Water Circuit within the Winding of Turbo Generator. Simulation tests are first shown in this paper at the beginning and the factors concerned with the tests are studied such as flow and temperature difference. Then, hot water flow field test is conducted in some power plants. In the end, some conclusions are drawn which will make useful reference and guidance for field test and application.
- Copyright
- © 2016, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Ming Li AU - Andong Wang AU - Zhiwei Cao AU - Fuchun Sun AU - Shanhua Sun AU - Guangke Xu AU - Weiwei Zhang AU - Changling Wang PY - 2016/12 DA - 2016/12 TI - The Application of Hot Water Flow Method for Checking the Water Circuit Within the Winding of Turbo Generator BT - Proceedings of the 2016 5th International Conference on Sustainable Energy and Environment Engineering (ICSEEE 2016) PB - Atlantis Press SP - 121 EP - 125 SN - 2352-5401 UR - https://doi.org/10.2991/icseee-16.2016.20 DO - 10.2991/icseee-16.2016.20 ID - Li2016/12 ER -