Facility Requirement Analysis of an UHV Transformer’s Short-circuit Test
- DOI
- 10.2991/isrme-15.2015.111How to use a DOI?
- Keywords
- ultra-high voltage, transformer, short-circuit test, short circuit generator, IEC 60076.5
- Abstract
As the global energy problem becomes more and more severe, the ultra-high voltage (UHV) AC transmission technology will get a large number of applications. The UHV transformer, as one of the important equipments of the transmission system, its quality and reliability is directly related to the safe and stable operation of power system. At present, the normal performance of the UHV transformer is available by test method, except the ability to withstand short circuit need have the aid of calculation and simulation. Based on transformer short-circuit test requirements, the UHV transformer's maximum test ability of Changzhou Inspection & Testing Center for Electrical Equipment and the facility requirement of the commercial UHV transformer's short-circuit test are analyzed respectively in this paper.
- Copyright
- © 2015, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Zhanfeng Zheng AU - Xike Wu AU - Shen Hong AU - Guan Hu AU - Leyi Ge AU - Ji Liu AU - Ping Yi AU - Zhengping Ding PY - 2015/04 DA - 2015/04 TI - Facility Requirement Analysis of an UHV Transformer’s Short-circuit Test BT - Proceedings of the 2015 International Conference on Intelligent Systems Research and Mechatronics Engineering PB - Atlantis Press SP - 524 EP - 529 SN - 1951-6851 UR - https://doi.org/10.2991/isrme-15.2015.111 DO - 10.2991/isrme-15.2015.111 ID - Zheng2015/04 ER -