Proceedings of the 2015 International Conference on Industrial Technology and Management Science

Two-Layers CE Algorithm for Flexible Job Shop Scheduling Problem with Electric Power Cost Considered

Authors
G.R. Wang, Q.Q. Li
Corresponding Author
G.R. Wang
Available Online November 2015.
DOI
10.2991/itms-15.2015.103How to use a DOI?
Keywords
Cross entropy; FJSP; Scheduling; Electric power co
Abstract

Propose a Two-Layers CE algorithm to solve flexible job shop scheduling problem. Two optimal objectives are considered: makespan and electric power cost. Analyze the influence of different values of the weight vector to the two objectives. Different simulation instances with different problem scale are devised to validate the superior performance of the algorithm.

Copyright
© 2015, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Download article (PDF)

Volume Title
Proceedings of the 2015 International Conference on Industrial Technology and Management Science
Series
Advances in Computer Science Research
Publication Date
November 2015
ISBN
10.2991/itms-15.2015.103
ISSN
2352-538X
DOI
10.2991/itms-15.2015.103How to use a DOI?
Copyright
© 2015, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Cite this article

TY  - CONF
AU  - G.R. Wang
AU  - Q.Q. Li
PY  - 2015/11
DA  - 2015/11
TI  - Two-Layers CE Algorithm for Flexible Job Shop Scheduling Problem with Electric Power Cost Considered
BT  - Proceedings of the 2015 International Conference on Industrial Technology and Management Science
PB  - Atlantis Press
SP  - 432
EP  - 435
SN  - 2352-538X
UR  - https://doi.org/10.2991/itms-15.2015.103
DO  - 10.2991/itms-15.2015.103
ID  - Wang2015/11
ER  -