Proceedings of the 2018 International Symposium on Social Science and Management Innovation (SSMI 2018)

Cost Management of Power Engineering Projects based on BIM Life Cycle

Authors
Lu Liu, Liang Shang
Corresponding Author
Lu Liu
Available Online February 2019.
DOI
10.2991/ssmi-18.2019.34How to use a DOI?
Keywords
BIM; Full life cycle; Power engineering; Cost management; Engineering quantity calculation.
Abstract

The whole life cycle cost management of power engineering refers to the enterprise considering the problem from the perspective of cost and cost, and scientifically controlling and controlling the project investment funds. The whole cycle of the project is characterized by a wide range of management and control, and a large time span. Due to the fact that the power engineering has a progress forecast and the cost management is not scientific enough, the system is poor, and the accuracy is low, there is a deviation between the cost management and the various progress control nodes. For this reason, the BIM technology is applied, and the cost simulation is carried out. Demonstrate the feasibility of the construction organization plan and calculate the quantity of the project to show the relationship between the cost and the progress more intuitively and clearly. On this basis, a more scientific, accurate and effective life cycle cost management of power engineering is realized.

Copyright
© 2019, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Download article (PDF)

Volume Title
Proceedings of the 2018 International Symposium on Social Science and Management Innovation (SSMI 2018)
Series
Advances in Economics, Business and Management Research
Publication Date
February 2019
ISBN
10.2991/ssmi-18.2019.34
ISSN
2352-5428
DOI
10.2991/ssmi-18.2019.34How to use a DOI?
Copyright
© 2019, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Cite this article

TY  - CONF
AU  - Lu Liu
AU  - Liang Shang
PY  - 2019/02
DA  - 2019/02
TI  - Cost Management of Power Engineering Projects based on BIM Life Cycle
BT  - Proceedings of the 2018 International Symposium on Social Science and Management Innovation (SSMI 2018)
PB  - Atlantis Press
SP  - 192
EP  - 197
SN  - 2352-5428
UR  - https://doi.org/10.2991/ssmi-18.2019.34
DO  - 10.2991/ssmi-18.2019.34
ID  - Liu2019/02
ER  -