Preliminary Discussion on the Management of Construction Contracts

Authors
Yunhua Liu
Corresponding Author
Yunhua Liu
Available Online June 2015.
DOI
10.2991/ap3er-15.2015.118How to use a DOI?
Keywords
construction;engineering quality; project duration ;project cost;contract management.
Abstract

A contract for construction project is of great significance to the whole project, it relates to the engineering quality, project duration ,project cost and all other content, so do the construction contract management can not only avoid unnecessary disputes in the process of engineering construction, but also can guarantee the legitimate rights and interests of contract parties, more conducive to the smooth completion of the project. At present, the problems existing in the part of construction project contract management: The signing of the contract is not tight, Irregularity in the execution of contract, Failure to conduct contract variation when variation is required, Negligence of management of contract documents. This paper is divided by body put forward the following measures: Establishment of rules and regulations and management procedures, Taking full advantage of contract template, Enhancement of awareness of contract, Establishment of sound contract management system, Strengthening of management of contract claim, Inspecting contract performance on a regular basis, Enhancing management of contract documents .The choice of contract management personnel qualified by weight method, so as to ensure the contract management personnel management level and to ensure that the overall level of project management.

Copyright
© 2015, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Download article (PDF)

Volume Title
Proceedings of the 2015 Asia-Pacific Energy Equipment Engineering Research Conference
Series
Advances in Engineering Research
Publication Date
June 2015
ISBN
10.2991/ap3er-15.2015.118
ISSN
2352-5401
DOI
10.2991/ap3er-15.2015.118How to use a DOI?
Copyright
© 2015, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Cite this article

TY  - CONF
AU  - Yunhua Liu
PY  - 2015/06
DA  - 2015/06
TI  - Preliminary Discussion on the Management of Construction Contracts
BT  - Proceedings of the 2015 Asia-Pacific Energy Equipment Engineering Research Conference
PB  - Atlantis Press
SP  - 496
EP  - 499
SN  - 2352-5401
UR  - https://doi.org/10.2991/ap3er-15.2015.118
DO  - 10.2991/ap3er-15.2015.118
ID  - Liu2015/06
ER  -