Construction of Collaborative Operation Mode for Innovation and Creativity Platform Management Mechanism
- DOI
- 10.2991/978-94-6239-600-5_16How to use a DOI?
- Keywords
- Innovation and creativity platform; Collaborative operation; Management mechanism; 3i platform; Heyuan Power Supply Bureau
- Abstract
Implementation results show that after optimizing the collaboration mechanism, Heyuan Power Supply Bureau’s innovation platform leveraged intelligent module linkage to achieve dynamic resource allocation. Project completion rates rose from 65% to 90%. By optimizing project workflows through computer algorithms, the average project cycle shortened by 33.3%. Breaking down information silos via cross-departmental data sharing systems increased interdepartmental projects by 75%. Concurrently, the achievement conversion rate climbed from 30% to 55%, annual per-capita points increased by 87.5%, and the platform’s daily active rate reached 85%. These metrics confirm that the synergistic operation model—integrating intelligent module linkage, cross-departmental coordination mechanisms, and a refined points-based incentive system—effectively enhances the efficiency of innovation resource allocation, stimulates employee innovation enthusiasm, and provides a replicable reference for innovation management within power grid enterprises.
- Copyright
- © 2026 The Author(s)
- Open Access
- Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.
Cite this article
TY - CONF AU - Xiaotao Zhong AU - Zhendong Chen AU - Ye Li AU - Ting Liu AU - Huiling Liu PY - 2026 DA - 2026/02/26 TI - Construction of Collaborative Operation Mode for Innovation and Creativity Platform Management Mechanism BT - Proceedings of the 2025 8th International Conference on Civil Architecture, Hydropower and Engineering Management (CAHEM 2025) PB - Atlantis Press SP - 158 EP - 164 SN - 2352-5401 UR - https://doi.org/10.2991/978-94-6239-600-5_16 DO - 10.2991/978-94-6239-600-5_16 ID - Zhong2026 ER -