Research on the Compensation of Construction Scheme Change in EPC Projects
Authors
Tong Zheng
Corresponding Author
Tong Zheng
Available Online March 2018.
- DOI
- 10.2991/emehss-18.2018.95How to use a DOI?
- Keywords
- Construction program, construction integration project procurement, construction (EPC) model.
- Abstract
Because of the particularity of the Engineering-Procurement-Construction (EPC) mode of the integration of design and construction. In the contract, there is no specific definition of the right and responsibility identification after the change of the construction scheme, which leads to a series disputes. In this regard, this paper summarizes three reasons that lead to the change of the construction scheme. On the basis of this, it discusses the compensation for time and cos after the change of construction scheme.
- Copyright
- © 2018, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Tong Zheng PY - 2018/03 DA - 2018/03 TI - Research on the Compensation of Construction Scheme Change in EPC Projects BT - Proceedings of the 2nd International Conference on Economics and Management, Education, Humanities and Social Sciences (EMEHSS 2018) PB - Atlantis Press SP - 474 EP - 477 SN - 2352-5398 UR - https://doi.org/10.2991/emehss-18.2018.95 DO - 10.2991/emehss-18.2018.95 ID - Zheng2018/03 ER -