Proceedings of the 2016 International Conference on Engineering Science and Management

The Pier Foundation Design of the Beijing-shenyang Passenger Line Liaohe Super-large Bridge

Authors
Zhao Wan, Chen Chen
Corresponding Author
Zhao Wan
Available Online August 2016.
DOI
10.2991/esm-16.2016.5How to use a DOI?
Keywords
Bored piles, pile foundation design, numerical simulation
Abstract

In recent years, with the rapid economic development of the China, the railway construction also experiences a fast growth. State Department adopts The Twelfth Five-Year Plan of Transportation in 2012, and plans to build a batch of great railway projects. The construction program of Beijing-Shenyang Passenger Line is one of them. The main content of this article is to design the pile foundation of the Liaohe Bridge in Beijing-Shenyang Passenger Line. Using the large diameter bored piles, and design the pile foundation in detail according to the standard, including the settlement of pile, the bearing capacity and the design of the pile caps. Furthermore, it also used FLAC3D to simulate. Through the comparison of simulation results and calculation results, it found that simulation of the ultimate bearing capacity of the pile has little different than the calculation results, the error is 7.1%, settlement rule is also consistent with reality, but the settlement has certain differences, the error is 63.5%. Overall the results of the numerical simulation have played a certain reference role for the design of pile foundation.

Copyright
© 2016, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Download article (PDF)

Volume Title
Proceedings of the 2016 International Conference on Engineering Science and Management
Series
Advances in Engineering Research
Publication Date
August 2016
ISBN
10.2991/esm-16.2016.5
ISSN
2352-5401
DOI
10.2991/esm-16.2016.5How to use a DOI?
Copyright
© 2016, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Cite this article

TY  - CONF
AU  - Zhao Wan
AU  - Chen Chen
PY  - 2016/08
DA  - 2016/08
TI  - The Pier Foundation Design of the Beijing-shenyang Passenger Line Liaohe Super-large Bridge
BT  - Proceedings of the 2016 International Conference on Engineering Science and Management
PB  - Atlantis Press
SP  - 18
EP  - 21
SN  - 2352-5401
UR  - https://doi.org/10.2991/esm-16.2016.5
DO  - 10.2991/esm-16.2016.5
ID  - Wan2016/08
ER  -