Proceedings of the International Conference On Applied Science and Technology 2019 - Social Sciences Track (iCASTSS 2019)

Manpower Optimisation Needs with Workload Approach Using NASA-TLX Method on Ship Reparation

Authors
Nurul Noviandani, Arie Indartono, Fitri Hardiyanti
Corresponding Author
Nurul Noviandani
Available Online October 2019.
DOI
10.2991/icastss-19.2019.68How to use a DOI?
Keywords
workload, standard time, NASA-TLX, full time equivalent
Abstract

One of many things that could help the company to achieve their goals is a good human resource planning. The right calculation to optimize the manpower needs can make a company be more effective, efficient, and productive in finishing their works. In contrast, to increase productivity, the workload would be increasing too. KM. Asia Putra reparation in PT. Adiluhung Saranasegara Indonesia will be used as the object of this research because the project is considered to experience a long delay. The main purpose of this study is to provide recommendations for recruiting more manpower with a workload approach. The method that chosen is NASA-TLX which is a method that calculate workload subjectively. The result from NASA-TLX method recommends the company to add 35 more manpower to reach the optimal number for ship reparation process. With the recommendation, the schedule of ships reparation that was first planned for 25 days could be reduced 18 days. This study has a limitation in the field of cost that could be used as an object for further research.

Copyright
© 2019, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Download article (PDF)

Volume Title
Proceedings of the International Conference On Applied Science and Technology 2019 - Social Sciences Track (iCASTSS 2019)
Series
Advances in Social Science, Education and Humanities Research
Publication Date
October 2019
ISBN
10.2991/icastss-19.2019.68
ISSN
2352-5398
DOI
10.2991/icastss-19.2019.68How to use a DOI?
Copyright
© 2019, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Cite this article

TY  - CONF
AU  - Nurul Noviandani
AU  - Arie Indartono
AU  - Fitri Hardiyanti
PY  - 2019/10
DA  - 2019/10
TI  - Manpower Optimisation Needs with Workload Approach Using NASA-TLX Method on Ship Reparation
BT  - Proceedings of the International Conference On Applied Science and Technology 2019 - Social Sciences Track (iCASTSS 2019)
PB  - Atlantis Press
SP  - 77
EP  - 80
SN  - 2352-5398
UR  - https://doi.org/10.2991/icastss-19.2019.68
DO  - 10.2991/icastss-19.2019.68
ID  - Noviandani2019/10
ER  -