Proceedings of the 2016 International Conference on Civil, Transportation and Environment

Safety monitoring control technique of construction speed of soft groundsill damming in Shuangwangcheng reservoir

Authors
Fang Xu, Wang-Lin Li, Fei Yan, Bo-Fan Zhang, Zhan-Lei Liu
Corresponding Author
Fang Xu
Available Online January 2016.
DOI
10.2991/iccte-16.2016.80How to use a DOI?
Keywords
soft groundsill damming, construction speed, safety monitoring control, excess hydrostatic pore water pressure, stability of dam slope
Abstract

Controlling construction speed is a key factor to ensure the stability of dam slope in soft groundsill. In this paper, for the construction of soft groundsill damming in Shuangwangcheng reservoir, a dynamic monitoring method of soft groundsill damming, considering the excess hydrostatic pore water pressure and anti-slide stability safety surplus degree of dam slope during the construction, was proposed. First, the real-time excess hydrostatic pore water pressure in soft soil layer during the construction was obtained by monitoring. Second, the real-time stability safety factors of dam slope during the construction was obtained by analyzing the stability of dam slope. Finally, according to the stress levels of excess hydrostatic pore water pressure and stability safety factors of dam slope during the construction, different monitoring and early-warning threshold values were set, then the construction safety level was evaluated and different monitoring control predetermined plan were employed to take different engineering measures to ensure the safety of dam. This method can ensure the stability of the dam foundation and improve construction efficiency, shorten the construction period and save the project cost.

Copyright
© 2016, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Download article (PDF)

Volume Title
Proceedings of the 2016 International Conference on Civil, Transportation and Environment
Series
Advances in Engineering Research
Publication Date
January 2016
ISBN
10.2991/iccte-16.2016.80
ISSN
2352-5401
DOI
10.2991/iccte-16.2016.80How to use a DOI?
Copyright
© 2016, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Cite this article

TY  - CONF
AU  - Fang Xu
AU  - Wang-Lin Li
AU  - Fei Yan
AU  - Bo-Fan Zhang
AU  - Zhan-Lei Liu
PY  - 2016/01
DA  - 2016/01
TI  - Safety monitoring control technique of construction speed of soft groundsill damming in Shuangwangcheng reservoir
BT  - Proceedings of the 2016 International Conference on Civil, Transportation and Environment
PB  - Atlantis Press
SP  - 478
EP  - 482
SN  - 2352-5401
UR  - https://doi.org/10.2991/iccte-16.2016.80
DO  - 10.2991/iccte-16.2016.80
ID  - Xu2016/01
ER  -