A Study on Computerized Simulation of difference between CPM and CCPM
- DOI
- 10.2991/icmemtc-16.2016.83How to use a DOI?
- Keywords
- computerized simulation; CCPM+; CPM; CCPM
- Abstract
The constant delays of projects demonstrate that traditional project planning methods may adopt an inefficient way to manage uncertainty. To tackle problems in traditional project system, CCPM (Critical Chain Project Management) was introduced by Goldratt(1997) to identify both task dependence and resource conflicts as main constraints within a project[1]. This method is characterized by applying Theory of Constraints in project management and inserting buffers to deal with uncertainty. Although CCPM have demonstrated certain success and is regarded as an alternative of traditional project planning technique, lots of projects still suffer from considerable failure. Given the condition that CCPM is still under doubt and has not been applied widely, this paper conducts investigation about difference between CCPM and CPM/PERT based on computerized simulation of case study.
- Copyright
- © 2016, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Fan Zhang PY - 2016/04 DA - 2016/04 TI - A Study on Computerized Simulation of difference between CPM and CCPM BT - Proceedings of the 2016 3rd International Conference on Materials Engineering, Manufacturing Technology and Control PB - Atlantis Press SP - 432 EP - 434 SN - 2352-5401 UR - https://doi.org/10.2991/icmemtc-16.2016.83 DO - 10.2991/icmemtc-16.2016.83 ID - Zhang2016/04 ER -