The Research on The Time-Dependent Evaluation Model of Space Debris Removal
Authors
Junjie Zhou
Corresponding Author
Junjie Zhou
Available Online April 2016.
- DOI
- 10.2991/icmemtc-16.2016.182How to use a DOI?
- Keywords
- Time-Dependent Alternatives Evaluation Model; space debris; Borda Count Method
- Abstract
In this paper, we build the Time-Dependent Alternatives Evaluation Model to determine the best alternative or combination of alternatives to remove the space debris. The model is consist of three small models, such as Costs, Risks and Benefits models which are time-dependent models. After consulting some researches, we discover five basic alternatives: S1, S2, S3, S4, S5. Using measure parameters of the alternatives, we obtain specific quantities of Costs, Risks and Benefits. Considering the factors, we qualitatively analyze five alternatives by Borda Count Method. S2 (ground-based laser) might be the best alternative.
- Copyright
- © 2016, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Junjie Zhou PY - 2016/04 DA - 2016/04 TI - The Research on The Time-Dependent Evaluation Model of Space Debris Removal BT - Proceedings of the 2016 3rd International Conference on Materials Engineering, Manufacturing Technology and Control PB - Atlantis Press SP - 926 EP - 929 SN - 2352-5401 UR - https://doi.org/10.2991/icmemtc-16.2016.182 DO - 10.2991/icmemtc-16.2016.182 ID - Zhou2016/04 ER -