Proceedings of the 2016 3rd International Conference on Materials Engineering, Manufacturing Technology and Control

Application of Risk Factor Analysis Method in Bid Quotation

Authors
Ji-feng Zuo, Xue-chang Wang, Xuefei Li
Corresponding Author
Ji-feng Zuo
Available Online April 2016.
DOI
10.2991/icmemtc-16.2016.256How to use a DOI?
Keywords
Risk analysis; Fuzzy mathematics; Bid quotation
Abstract

In this paper, a new method of weight determination and fuzzy mathematics is introduced, and the characteristics of risk factors of project bidding quotation are introduced, and a quantitative method for the risk analysis of bidding quotation is put forward.

Copyright
© 2016, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Download article (PDF)

Volume Title
Proceedings of the 2016 3rd International Conference on Materials Engineering, Manufacturing Technology and Control
Series
Advances in Engineering Research
Publication Date
April 2016
ISBN
10.2991/icmemtc-16.2016.256
ISSN
2352-5401
DOI
10.2991/icmemtc-16.2016.256How to use a DOI?
Copyright
© 2016, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Cite this article

TY  - CONF
AU  - Ji-feng Zuo
AU  - Xue-chang Wang
AU  - Xuefei Li
PY  - 2016/04
DA  - 2016/04
TI  - Application of Risk Factor Analysis Method in Bid Quotation
BT  - Proceedings of the 2016 3rd International Conference on Materials Engineering, Manufacturing Technology and Control
PB  - Atlantis Press
SP  - 1307
EP  - 1310
SN  - 2352-5401
UR  - https://doi.org/10.2991/icmemtc-16.2016.256
DO  - 10.2991/icmemtc-16.2016.256
ID  - Zuo2016/04
ER  -