Proceedings of the 2018 6th International Conference on Machinery, Materials and Computing Technology (ICMMCT 2018)

The Discussion of Field Management on Electric Energy Metering Device

Authors
Zhitong Liu, Chen Li, Yuan Chang, Songjie Shi, Jiguang Xue, Gang Liu, Qiuxia Jia, Zhili Tian, Shuguang Zhan, Hui Tang
Corresponding Author
Zhitong Liu
Available Online June 2018.
DOI
10.2991/icmmct-18.2018.36How to use a DOI?
Keywords
power measurement, safe operation, technical measures, reliability
Abstract

Electric measurement is a very important factory enterprise work, it is also the key for the energy measurement and product cost accounting. The quality management of electric energy metering device is a very important work and is also the key to electric power enterprises and users to establish a trust relationship, once the electric energy metering device breaks down and faults, the reliability of the measurement will get in trouble, and causes measurement errors and even interrupt measurement, will not be able to get the real measurement results, the paper probes into the technical measures for management of electric energy metering device.

Copyright
© 2018, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Download article (PDF)

Volume Title
Proceedings of the 2018 6th International Conference on Machinery, Materials and Computing Technology (ICMMCT 2018)
Series
Advances in Engineering Research
Publication Date
June 2018
ISBN
10.2991/icmmct-18.2018.36
ISSN
2352-5401
DOI
10.2991/icmmct-18.2018.36How to use a DOI?
Copyright
© 2018, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Cite this article

TY  - CONF
AU  - Zhitong Liu
AU  - Chen Li
AU  - Yuan Chang
AU  - Songjie Shi
AU  - Jiguang Xue
AU  - Gang Liu
AU  - Qiuxia Jia
AU  - Zhili Tian
AU  - Shuguang Zhan
AU  - Hui Tang
PY  - 2018/06
DA  - 2018/06
TI  - The Discussion of Field Management on Electric Energy Metering Device
BT  - Proceedings of the 2018 6th International Conference on Machinery, Materials and Computing Technology (ICMMCT 2018)
PB  - Atlantis Press
SP  - 185
EP  - 188
SN  - 2352-5401
UR  - https://doi.org/10.2991/icmmct-18.2018.36
DO  - 10.2991/icmmct-18.2018.36
ID  - Liu2018/06
ER  -