The Schedule Optimization and Control of Nuclear Power Construction Project Prophase Based on Petri Network

Authors
Yu Lei, Ruyu Zhang, Yan Ding, Jianfeng Lin, Lirong Liu, Lei Qin
Corresponding Author
Yu Lei
Available Online December 2015.
DOI
10.2991/icmse-15.2015.48How to use a DOI?
Keywords
nuclear power construction project; Petri network; schedule optimization; feasibility study phase; WBS decomposition
Abstract

The work content of nuclear power plant project prophase covers a wide range, involves many kinds of professional, which cause the work coordination of the whole stage more difficult, have very strong complexity and uncertainty. On the basis of WBS decomposition in the initial feasibility study phase of nuclear power project, a model based on delay Petri network was established, the critical path of the network plan was found, the reachable marking graph(RMG) was formed, and the optimal state path was determined by calculating the arrival time of all states in the graph, thus project schedule optimization was achieved. The research results have contributed to the development of nuclear power plant project, by controlling the project schedule of the research phase, the level of China’s nuclear power construction project managements have been improved, and the development of nuclear power project have been promoted.

Copyright
© 2015, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Download article (PDF)

Volume Title
Proceedings of the 2015 6th International Conference on Manufacturing Science and Engineering
Series
Advances in Engineering Research
Publication Date
December 2015
ISBN
10.2991/icmse-15.2015.48
ISSN
2352-5401
DOI
10.2991/icmse-15.2015.48How to use a DOI?
Copyright
© 2015, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Cite this article

TY  - CONF
AU  - Yu Lei
AU  - Ruyu Zhang
AU  - Yan Ding
AU  - Jianfeng Lin
AU  - Lirong Liu
AU  - Lei Qin
PY  - 2015/12
DA  - 2015/12
TI  - The Schedule Optimization and Control of Nuclear Power Construction Project Prophase Based on Petri Network
BT  - Proceedings of the 2015 6th International Conference on Manufacturing Science and Engineering
PB  - Atlantis Press
SP  - 248
EP  - 255
SN  - 2352-5401
UR  - https://doi.org/10.2991/icmse-15.2015.48
DO  - 10.2991/icmse-15.2015.48
ID  - Lei2015/12
ER  -