Cost Comparison Analysis of Fence Work Between Conventional Walls and Pracest Concrete (Case Study of West Java Petrochemical Complex Project) at PT Pertamina International

Authors
Dede Ahmad Yusuf1, *, Andra Gerinta Prahasta1, Tesan Peranata Pauzan1, Dio Damas Permadi1, Utamy Sukmayu Saputri1
1Depatrmen of Civil Engineering Faculty of Engineering and Design, Nusa Putra University Sukabumi, Sukabumi, Indonesia
*Corresponding author. Email: dede.ahmad_ts20@nusaputra.ac.id
Corresponding Author
Dede Ahmad Yusuf
Available Online 13 May 2024.
DOI
10.2991/978-94-6463-406-8_20How to use a DOI?
Keywords
Conventional; Concrete Fence; Cost Comparison; Precast (key words)
Abstract

The fence is one of the important components in a building which functions as an area barrier, protects privatization, protects security (safety), art and beauty of the building being fenced, generally fences are made of concrete, brick, steel, stainless steel, live plants, wood / planks and river stones. The fence work was carried out using two work methods, namely using the precast concrete method and the hebel or light brick wall method. This research aims to determine the price of work and the duration of work on fences between precast concrete using two different grades of concrete using conventional methods (light brick wall installation) as well as the methods recommended in terms of cost and time The construction period of precast wall installation is shorter than that of conventional wall installation. A precast wall project takes three months. While conventional walls take an average of four months. Precast walls feature practical modular installation methods as well as fabrication of Similar panel components. Conventional wall work (masonry) takes longer to perform compared to prefabricated walls. (Abstract).

Copyright
© 2024 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Download article (PDF)

Volume Title
Proceedings of the 2nd International Conference on Consumer Technology and Engineering Innovation (ICONTENTION 2023)
Series
Advances in Engineering Research
Publication Date
13 May 2024
ISBN
10.2991/978-94-6463-406-8_20
ISSN
2352-5401
DOI
10.2991/978-94-6463-406-8_20How to use a DOI?
Copyright
© 2024 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution-NonCommercial 4.0 International License (http://creativecommons.org/licenses/by-nc/4.0/), which permits any noncommercial use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Cite this article

TY  - CONF
AU  - Dede Ahmad Yusuf
AU  - Andra Gerinta Prahasta
AU  - Tesan Peranata Pauzan
AU  - Dio Damas Permadi
AU  - Utamy Sukmayu Saputri
PY  - 2024
DA  - 2024/05/13
TI  - Cost Comparison Analysis of Fence Work Between Conventional Walls and Pracest Concrete (Case Study of West Java Petrochemical Complex Project) at PT Pertamina International
BT  - Proceedings of the 2nd International Conference on Consumer Technology and Engineering Innovation (ICONTENTION 2023)
PB  - Atlantis Press
SP  - 109
EP  - 113
SN  - 2352-5401
UR  - https://doi.org/10.2991/978-94-6463-406-8_20
DO  - 10.2991/978-94-6463-406-8_20
ID  - Yusuf2024
ER  -