2nd International Conference On Systems Engineering and Modeling (ICSEM-13)

A Method for Ranking Battlefield Damaged Equipment Repairs Based on Projection Pursuit Method

Authors
Xiao-yan Wang, Tao Shi, Yu-cai Dong, Su-wen Zheng, Dong-yun Zheng, Xue -qin Pan, Jian Du, Qi Jin
Corresponding Author
Xiao-yan Wang
Available Online April 2013.
DOI
https://doi.org/10.2991/icsem.2013.36How to use a DOI?
Keywords
projection pursuit method, battlefield damaged equipment, ranking repairs.
Abstract
The key impact indicators of battlefield damage equipment repair order are transformed into one-dimensional projection values with the method of projection pursuit. The repair order of battlefield damage equipment is got and weights of all key performance indicators are clear. The example is applied to explain application effect of this method. The experiment shows that the method is easy to decision-making, strong objectivity, applicability and operability, has great significance to enhance the combat effectiveness of troops.
Open Access
This is an open access article distributed under the CC BY-NC license.

Download article (PDF)

Proceedings
2nd International Conference On Systems Engineering and Modeling (ICSEM-13)
Part of series
Advances in Intelligent Systems Research
Publication Date
April 2013
ISBN
978-94-91216-42-8
ISSN
1951-6851
DOI
https://doi.org/10.2991/icsem.2013.36How to use a DOI?
Open Access
This is an open access article distributed under the CC BY-NC license.

Cite this article

TY  - CONF
AU  - Xiao-yan Wang
AU  - Tao Shi
AU  - Yu-cai Dong
AU  - Su-wen Zheng
AU  - Dong-yun Zheng
AU  - Xue -qin Pan
AU  - Jian Du
AU  - Qi Jin
PY  - 2013/04
DA  - 2013/04
TI  - A Method for Ranking Battlefield Damaged Equipment Repairs Based on Projection Pursuit Method
BT  - 2nd International Conference On Systems Engineering and Modeling (ICSEM-13)
PB  - Atlantis Press
SN  - 1951-6851
UR  - https://doi.org/10.2991/icsem.2013.36
DO  - https://doi.org/10.2991/icsem.2013.36
ID  - Wang2013/04
ER  -