Proceedings of the 2017 3rd International Forum on Energy, Environment Science and Materials (IFEESM 2017)

Analysis and Application of Flood Estimation Methods during Project Construction

Authors
Jishu Yin, Jianbin Wang
Corresponding Author
Jishu Yin
Available Online February 2018.
DOI
10.2991/ifeesm-17.2018.33How to use a DOI?
Keywords
Construction, Flood Estimation, Analysis of the Application.
Abstract

An estimation of the design flood is required for projects constructed across rivers. Flood peak values exert direct effects on the selection of construction proposals, the cost prediction, and the construction safety. Differenct methods for flood estimation may be determined specifically in each case. Proper selection of flood estimation methods is of great significance for ensuring a smooth construction process.

Copyright
© 2018, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Download article (PDF)

Volume Title
Proceedings of the 2017 3rd International Forum on Energy, Environment Science and Materials (IFEESM 2017)
Series
Advances in Engineering Research
Publication Date
February 2018
ISBN
10.2991/ifeesm-17.2018.33
ISSN
2352-5401
DOI
10.2991/ifeesm-17.2018.33How to use a DOI?
Copyright
© 2018, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Cite this article

TY  - CONF
AU  - Jishu Yin
AU  - Jianbin Wang
PY  - 2018/02
DA  - 2018/02
TI  - Analysis and Application of Flood Estimation Methods during Project Construction
BT  - Proceedings of the 2017 3rd International Forum on Energy, Environment Science and Materials (IFEESM 2017)
PB  - Atlantis Press
SP  - 173
EP  - 176
SN  - 2352-5401
UR  - https://doi.org/10.2991/ifeesm-17.2018.33
DO  - 10.2991/ifeesm-17.2018.33
ID  - Yin2018/02
ER  -