Capacitated Multi-item joint Procurement Models with Outsourcing and Backlogging
Authors
Jinhong Zhong, Yong Wang, Xiaofei Yu
Corresponding Author
Jinhong Zhong
Available Online January 2016.
- DOI
- 10.2991/ifmeita-16.2016.186How to use a DOI?
- Keywords
- Multi-item dynamic lot-sizing problem; Outsourcing; Backlogging; Budget restriction
- Abstract
This paper addresses a multi-item joint procurement lot-sizing problem with limited budget, outsourcing, and backlogging, where product-dependent minor setup cost and major setup cost are considered. We build four models and code Lingo-based simulation scripts. By the comparative experiments, we find that backlogging and outsourcing policies can reduce the system total cost.
- Copyright
- © 2016, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Jinhong Zhong AU - Yong Wang AU - Xiaofei Yu PY - 2016/01 DA - 2016/01 TI - Capacitated Multi-item joint Procurement Models with Outsourcing and Backlogging BT - Proceedings of the 2016 International Forum on Management, Education and Information Technology Application PB - Atlantis Press SP - 1021 EP - 1028 SN - 2352-5398 UR - https://doi.org/10.2991/ifmeita-16.2016.186 DO - 10.2991/ifmeita-16.2016.186 ID - Zhong2016/01 ER -