Evaluation of Fabrication Concrete Wave Breaker Project Scheduling with the Critical Chain Project Management Method

Authors
W Nugroho, M Faiizuddaroini, A Nalhadi, S Suryani, S Supriyadi
Corresponding Author
W Nugroho
Available Online 6 March 2020.
DOI
10.2991/assehr.k.200303.041How to use a DOI?
Keywords
critical chain project management, critical paths, fabrication of concrete wave breakers
Abstract

The project is successful if the implementation of project activities goes according to the allotted time. The problem of execution in the field is complicated to achieve appropriate actions following predetermined targets. This study aims to evaluate the delay in project activities that occur in the fabrication of concrete wave breakers. This study uses the critical chain project management method in analyzing essential activities that require attention. Based on data processing, critical paths that occur in concrete wave breaker fabrication activities include Engineering Verification, Purchasing Materials, Formwork Fabrication, Rebar fabrication, pouring concrete, mobilization concrete, closeout document. The improvement of the work system by using the critical chain project management was able to maximize the activity time to 53 days from its original duration of 64 days. Critical chain project management application is consistently able to reduce jobs that do not have added value that can hinder or prolong the project.

Copyright
© 2020, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Download article (PDF)

Volume Title
Proceedings of the 1st International Multidisciplinary Conference on Education, Technology, and Engineering (IMCETE 2019)
Series
Advances in Social Science, Education and Humanities Research
Publication Date
6 March 2020
ISBN
10.2991/assehr.k.200303.041
ISSN
2352-5398
DOI
10.2991/assehr.k.200303.041How to use a DOI?
Copyright
© 2020, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Cite this article

TY  - CONF
AU  - W Nugroho
AU  - M Faiizuddaroini
AU  - A Nalhadi
AU  - S Suryani
AU  - S Supriyadi
PY  - 2020
DA  - 2020/03/06
TI  - Evaluation of Fabrication Concrete Wave Breaker Project Scheduling with the Critical Chain Project Management Method
BT  - Proceedings of the 1st International Multidisciplinary Conference on Education, Technology, and Engineering (IMCETE 2019)
PB  - Atlantis Press
SP  - 170
EP  - 173
SN  - 2352-5398
UR  - https://doi.org/10.2991/assehr.k.200303.041
DO  - 10.2991/assehr.k.200303.041
ID  - Nugroho2020
ER  -