Proceedings of the 19th International Symposium on Management (INSYMA 2022)

Contract Analysis for Design and Build Lump Sum Price

(Case Study: Kuala Tanjung – Inderapura Toll Road Section 2)

Authors
Cut Riska Irnanda1, *, Isfenti Sadalia1, Nazaruddin1
1Universitas Sumatera Utara, Medan, Indonesia
*Corresponding author. Email: riskairnanda@gmail.com
Corresponding Author
Cut Riska Irnanda
Available Online 5 December 2022.
DOI
10.2991/978-94-6463-008-4_143How to use a DOI?
Keywords
contract construction analysis; design and build; lump sum
Abstract

A toll road is one of the National Strategic Projects with complete problems and needs highspeed performance during construction. So, contract construction that is usually applied to these projects is design and build contract. Furthermore, best practice for Design and Build is combined with Lump Sum as an estimation cost aspect, so the type of contract used is Design and Build Lump Sum Price. This study aims to review the implementation of the Design and Build Lup Sum Price Contract based on the terms and conditions in the Indonesian Legislation and FIDIC on the Trans Sumatra Toll Project Kuala Tanjung – Inderapura Section 2 according to the contractor’s point of view to mitigating the negative risks that arise especially in the financial aspect. This research is descriptive research with a qualitative data analysis method by comparing the implementation of the contract according to the applicable law. The first step was to collect secondary data in a contractual resume, then make a study based on existing legal standards. Based on the results, it can be stated that the design and build Lump Sum price contract is a construction work contract in order to complete a job within a certain period of time according to the basic design scope as the basis for quotation, which has fixed costs as long as no intervention results in changes contract documents that may give additional payments for the rights. In the construction of the Kuala Tanjung – Inderapura Toll Road Section 2, there was an additional scope of the contract which resulted in additional work due to instructions from the owner and other parties, as well as an intervention to change specifications due to differences in the basic design at the tender which poses negative risks to the financial aspect for the contractor.

Copyright
© 2023 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution 4.0 International License (http://creativecommons.org/licenses/by/4.0/), which permits use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Download article (PDF)

Volume Title
Proceedings of the 19th International Symposium on Management (INSYMA 2022)
Series
Advances in Economics, Business and Management Research
Publication Date
5 December 2022
ISBN
10.2991/978-94-6463-008-4_143
ISSN
2352-5428
DOI
10.2991/978-94-6463-008-4_143How to use a DOI?
Copyright
© 2023 The Author(s)
Open Access
Open Access This chapter is licensed under the terms of the Creative Commons Attribution 4.0 International License (http://creativecommons.org/licenses/by/4.0/), which permits use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.

Cite this article

TY  - CONF
AU  - Cut Riska Irnanda
AU  - Isfenti Sadalia
AU  - Nazaruddin
PY  - 2022
DA  - 2022/12/05
TI  - Contract Analysis for Design and Build Lump Sum Price
BT  - Proceedings of the 19th International Symposium on Management (INSYMA 2022)
PB  - Atlantis Press
SP  - 1162
EP  - 1169
SN  - 2352-5428
UR  - https://doi.org/10.2991/978-94-6463-008-4_143
DO  - 10.2991/978-94-6463-008-4_143
ID  - Irnanda2022
ER  -