Proceedings of the 2015 International Symposium on Material, Energy and Environment Engineering

Whole Process Investment Control of Power Grid Project Based on Closed-Loop Feedback System

Authors
Liaoyi Ning, Dunnan Liu, Jinyuan Liu, Lihang Ji, Xuefeng Wu, Ce Xiu
Corresponding Author
Liaoyi Ning
Available Online November 2015.
DOI
10.2991/ism3e-15.2015.56How to use a DOI?
Abstract

With the development of economy, the demand of electric power is higher and higher. At the same time, the development of various types of power grid makes the investment of power grid projects more and more, but there is no complete and effective way to monitor the whole process of power grid project. This paper introduces closed-loop feedback system. The investment of power grid project is divided into investment planning and the implementation of investment, and the investment monitoring points are selected. The closed-loop feedback system is used to dynamic monitoring of the whole process. Feedback the investment deviation and enter the next stage to control, correction, etc., so as to realize the investment control of power grid project and reduce the investment risk.

Copyright
© 2015, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Download article (PDF)

Volume Title
Proceedings of the 2015 International Symposium on Material, Energy and Environment Engineering
Series
Advances in Engineering Research
Publication Date
November 2015
ISBN
10.2991/ism3e-15.2015.56
ISSN
2352-5401
DOI
10.2991/ism3e-15.2015.56How to use a DOI?
Copyright
© 2015, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Cite this article

TY  - CONF
AU  - Liaoyi Ning
AU  - Dunnan Liu
AU  - Jinyuan Liu
AU  - Lihang Ji
AU  - Xuefeng Wu
AU  - Ce Xiu
PY  - 2015/11
DA  - 2015/11
TI  - Whole Process Investment Control of Power Grid Project Based on Closed-Loop Feedback System
BT  - Proceedings of the 2015 International Symposium on Material, Energy and Environment Engineering
PB  - Atlantis Press
SP  - 228
EP  - 231
SN  - 2352-5401
UR  - https://doi.org/10.2991/ism3e-15.2015.56
DO  - 10.2991/ism3e-15.2015.56
ID  - Ning2015/11
ER  -