Proceedings of the 2017 2nd Joint International Information Technology, Mechanical and Electronic Engineering Conference (JIMEC 2017)

Research On Risk Management Of Power Engineering Project Based On Fuzzy Comprehensive Evaluation Method

Authors
Li Jia-ming
Corresponding Author
Li Jia-ming
Available Online October 2017.
DOI
10.2991/jimec-17.2017.72How to use a DOI?
Keywords
Power engineering; Project risk; Index system; Multi-level fuzzy comprehensive evaluation
Abstract

With the increase of investment in electric power engineering project and the rapid development of electric power construction market, the risk factors and risks of the project are greatly increased. The traditional power project management methods can not meet the needs of modern enterprise development, the scientific and standard method of risk management for power engineering project is imperative. In this paper, based on the analysis of the conception and characteristics of electric power project risk management, the main influencing factors of power engineering project risk are identified, the risk evaluation model of power engineering project based on fuzzy comprehensive evaluation method is established. This paper provides theoretical basis for evaluation of the risk level of power engineering projects scientifically and effectively and strengthening the risk management of power industry.

Copyright
© 2017, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Download article (PDF)

Volume Title
Proceedings of the 2017 2nd Joint International Information Technology, Mechanical and Electronic Engineering Conference (JIMEC 2017)
Series
Advances in Computer Science Research
Publication Date
October 2017
ISBN
10.2991/jimec-17.2017.72
ISSN
2352-538X
DOI
10.2991/jimec-17.2017.72How to use a DOI?
Copyright
© 2017, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Cite this article

TY  - CONF
AU  - Li Jia-ming
PY  - 2017/10
DA  - 2017/10
TI  - Research On Risk Management Of Power Engineering Project Based On Fuzzy Comprehensive Evaluation Method
BT  - Proceedings of the 2017 2nd Joint International Information Technology, Mechanical and Electronic Engineering Conference (JIMEC 2017)
PB  - Atlantis Press
SP  - 325
EP  - 329
SN  - 2352-538X
UR  - https://doi.org/10.2991/jimec-17.2017.72
DO  - 10.2991/jimec-17.2017.72
ID  - Jia-ming2017/10
ER  -