Proceedings of the Taishan Academic Forum – Project on Mine Disaster Prevention and Control

Engineering and process design solutions for the vertical shaft completion

Authors
Weiguo Qiao, V.V. Pershin, E.G. Kassikhina, N.O. Butrim
Corresponding Author
Weiguo Qiao
Available Online October 2014.
DOI
10.2991/mining-14.2014.2How to use a DOI?
Keywords
vertical shaft completion, decrease of transient periods by means of application of efficient equipment and multifunctional steel angle headgears.
Abstract

The comprehensive approach including the combination of advanced and new technical solutions with the use of modern technology opportunities providing the real possibility to reduce the vertical shaft construction labour inputs, costs and time.

Copyright
© 2014, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Download article (PDF)

Volume Title
Proceedings of the Taishan Academic Forum – Project on Mine Disaster Prevention and Control
Series
Advances in Engineering Research
Publication Date
October 2014
ISBN
978-94-62520-29-5
ISSN
2352-5401
DOI
10.2991/mining-14.2014.2How to use a DOI?
Copyright
© 2014, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Cite this article

TY  - CONF
AU  - Weiguo Qiao
AU  - V.V. Pershin
AU  - E.G. Kassikhina
AU  - N.O. Butrim
PY  - 2014/10
DA  - 2014/10
TI  - Engineering and process design solutions for the vertical shaft completion
BT  - Proceedings of the Taishan Academic Forum – Project on Mine Disaster Prevention and Control
PB  - Atlantis Press
SP  - 5
EP  - 10
SN  - 2352-5401
UR  - https://doi.org/10.2991/mining-14.2014.2
DO  - 10.2991/mining-14.2014.2
ID  - Qiao2014/10
ER  -