BIM Implementation for Temporary Medical Facility: A Case Study in Huoshengshan and Leishengshan Hospital in Wuhan

Authors
Qi Hong1, *
1ZJU-UIUC International Campus, Zhejiang University, Haining, Jiaxing, Zhejiang Province, China
*Corresponding author. Email: Qi.18@intl.zju.edu.cn
Corresponding Author
Qi Hong
Available Online 16 May 2022.
DOI
10.2991/aebmr.k.220502.056How to use a DOI?
Keywords
Huoshenshan Hospital; Leishenshan Hospital; BIM technology; prefabricated building; Emergency Engineering Construction
Abstract

In response to the novel Coronavirus outbreak in Wuhan, China, in early 2020, two new hospitals, Huoshenshan and Leishenshan, were established. However, traditional construction methods cannot meet the requirements of building in a short time. The construction of these two hospitals adopts the design and construction mode of prefabricated buildings combined with BIM technology. Based on reviewing the literature on the combination of these two technologies in recent years, this paper analyzes the unique advantages of BIM technology in each stage of assembly building construction by taking the construction process of Huoshenshan Hospital as an example. The aim is to provide experience and reference for the construction of temporary medical facilities in other countries and regions also suffering from the epidemic.

Copyright
© 2022 The Authors. Published by Atlantis Press International B.V.
Open Access
This is an open access article distributed under the CC BY-NC 4.0 license.

Download article (PDF)

Volume Title
Proceedings of the 2022 International Conference on Urban Planning and Regional Economy(UPRE 2022)
Series
Advances in Economics, Business and Management Research
Publication Date
16 May 2022
ISBN
10.2991/aebmr.k.220502.056
ISSN
2352-5428
DOI
10.2991/aebmr.k.220502.056How to use a DOI?
Copyright
© 2022 The Authors. Published by Atlantis Press International B.V.
Open Access
This is an open access article distributed under the CC BY-NC 4.0 license.

Cite this article

TY  - CONF
AU  - Qi Hong
PY  - 2022
DA  - 2022/05/16
TI  - BIM Implementation for Temporary Medical Facility: A Case Study in Huoshengshan and Leishengshan Hospital in Wuhan
BT  - Proceedings of the 2022 International Conference on Urban Planning and Regional Economy(UPRE 2022)
PB  - Atlantis Press
SP  - 312
EP  - 316
SN  - 2352-5428
UR  - https://doi.org/10.2991/aebmr.k.220502.056
DO  - 10.2991/aebmr.k.220502.056
ID  - Hong2022
ER  -