Stress analysis of the through arch bridge double boom system
Authors
Ke-Xin Li, Xiao-Jun Ning
Corresponding Author
Ke-Xin Li
Available Online November 2015.
- DOI
- 10.2991/iccet-15.2015.263How to use a DOI?
- Keywords
- double boom system, suddenly broken, the internal force response
- Abstract
This paper by analyzing the existing double boom system, and combined with engineering examples the through arch bridge in the mobile load that is the role of vehicle load force each boom situation. Studied double boom system in response to vehicle load internal forces, also studied a boom when suddenly broken rib effect on belongs. We came to the conclusion, in the moving load short boom force more favorable than long boom, and boom suddenly off, the internal force will fluctuate internal force near the Arch Bridge under operational conditions effect.
- Copyright
- © 2015, the Authors. Published by Atlantis Press.
- Open Access
- This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).
Cite this article
TY - CONF AU - Ke-Xin Li AU - Xiao-Jun Ning PY - 2015/11 DA - 2015/11 TI - Stress analysis of the through arch bridge double boom system BT - Proceedings of the 5th International Conference on Civil Engineering and Transportation 2015 PB - Atlantis Press SP - 1410 EP - 1414 SN - 2352-5401 UR - https://doi.org/10.2991/iccet-15.2015.263 DO - 10.2991/iccet-15.2015.263 ID - Li2015/11 ER -