Proceedings of the 5th International Conference on Civil Engineering and Transportation 2015

Simulation of Ground-borne Vibration and Noise Due to High -speed Trains through Changsha Railway Station

Authors
Daoming Shen, Laidong Zhang, Songtao Xue
Corresponding Author
Daoming Shen
Available Online November 2015.
DOI
10.2991/iccet-15.2015.298How to use a DOI?
Keywords
fast train; elevated train station; ground-borne noise; structure vibration
Abstract

Ground-borne vibration and noise induced by train operations are two major environmental problems faced by rail transit systems. Current researches mainly focused on civil architectures and bridge structures but it is rare for large structures such as railway stations in most literatures. Within this framework, this paper presented an integrated predictive analytics to simulate the ground-borne vibration and noise due to high-speed train through Changsha railway station This analytics obtains an accurate prediction of structure -borne noise by considering the fluid-structure interaction based on excitation –spread- response finite element model of elevated station The results show that this integration of predictive method is very effective.

Copyright
© 2015, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Download article (PDF)

Volume Title
Proceedings of the 5th International Conference on Civil Engineering and Transportation 2015
Series
Advances in Engineering Research
Publication Date
November 2015
ISBN
10.2991/iccet-15.2015.298
ISSN
2352-5401
DOI
10.2991/iccet-15.2015.298How to use a DOI?
Copyright
© 2015, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Cite this article

TY  - CONF
AU  - Daoming Shen
AU  - Laidong Zhang
AU  - Songtao Xue
PY  - 2015/11
DA  - 2015/11
TI  - Simulation of Ground-borne Vibration and Noise Due to High -speed Trains through Changsha Railway Station
BT  - Proceedings of the 5th International Conference on Civil Engineering and Transportation 2015
PB  - Atlantis Press
SP  - 1599
EP  - 1603
SN  - 2352-5401
UR  - https://doi.org/10.2991/iccet-15.2015.298
DO  - 10.2991/iccet-15.2015.298
ID  - Shen2015/11
ER  -