Proceedings of the 2015 International Conference on Structural, Mechanical and Material Engineering

Study of rail freight capacity release in the typical existing trunk after the completion of high-speed railway

Authors
H.Y. Li, Y. Li
Corresponding Author
H.Y. Li
Available Online November 2015.
DOI
10.2991/icsmme-15.2015.29How to use a DOI?
Keywords
The Existing Line, Rail Freight Capacity Release, The Improved Deduction Coefficient Method
Abstract

After the completion and operation of the HSR (short for high-speed railway), a portion of passenger train flows in the existing parallel lines will transfer to the HSR, which is going to bring changes in the structure of train operation diagram, influences the carrying capacity of existing lines and releases the freight capacity of the network as well. This paper adopts the improved deduction coefficient method to calculate the releasing value of freight capacity in two cases, namely the decentralized dispatching and the continuous dispatching. Compared with the traditional deduction coefficient method, the result of the improved method is closer to the practical freight capacity. Taking Wuhan-Guangzhou segment of Beijing-Guangzhou high-speed railway for example, this paper quantifies the releasing value of freight capacity of Wuhan-Guangzhou segment belonging to the existing line based on comparative analysis of the number of passenger trains before and after the opening of the high-speed railway

Copyright
© 2015, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Download article (PDF)

Volume Title
Proceedings of the 2015 International Conference on Structural, Mechanical and Material Engineering
Series
Advances in Engineering Research
Publication Date
November 2015
ISBN
10.2991/icsmme-15.2015.29
ISSN
2352-5401
DOI
10.2991/icsmme-15.2015.29How to use a DOI?
Copyright
© 2015, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Cite this article

TY  - CONF
AU  - H.Y. Li
AU  - Y. Li
PY  - 2015/11
DA  - 2015/11
TI  - Study of rail freight capacity release in the typical existing trunk after the completion of high-speed railway
BT  - Proceedings of the 2015 International Conference on Structural, Mechanical and Material Engineering
PB  - Atlantis Press
SP  - 124
EP  - 127
SN  - 2352-5401
UR  - https://doi.org/10.2991/icsmme-15.2015.29
DO  - 10.2991/icsmme-15.2015.29
ID  - Li2015/11
ER  -