Proceedings of the 5th International Conference on Information Engineering for Mechanics and Materials

Scheduling design process with workflow for armored vehicle transmission

Authors
Zhibo Qiu, Nan Nan, Yan Qin
Corresponding Author
Zhibo Qiu
Available Online July 2015.
DOI
10.2991/icimm-15.2015.288How to use a DOI?
Keywords
Workflow; design process; optimizing; transmission; armored vehicle.
Abstract

Studying the scheduling problems of product design process is great significance to shorten the cycle of product development and to speed up product development. The problem of optimal scheduling of transmission design flow of armored vehicle can be regarded as an optimal problem of resource constrained project scheduling. Due to the complexity of the factors affecting project, the traditional perspective is difficult to establish the proper model. Through workflow modeling we can fully describe information of the processes. In this article, based on the problem of optimal scheduling of transmission design flow of armored vehicle, we studied scheduling optimization problems based on product design process of workflow, then provided the optimal model based on the product design process of workflow. At last, we developed a system platform based on product design project scheduling of workflow to allow users to define process of product design according to their requirements and to optimize the design task scheduling through optimal scheduling modules in the platform in order to achieve the goal of shortening project duration.

Copyright
© 2015, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Download article (PDF)

Volume Title
Proceedings of the 5th International Conference on Information Engineering for Mechanics and Materials
Series
Advances in Engineering Research
Publication Date
July 2015
ISBN
10.2991/icimm-15.2015.288
ISSN
2352-5401
DOI
10.2991/icimm-15.2015.288How to use a DOI?
Copyright
© 2015, the Authors. Published by Atlantis Press.
Open Access
This is an open access article distributed under the CC BY-NC license (http://creativecommons.org/licenses/by-nc/4.0/).

Cite this article

TY  - CONF
AU  - Zhibo Qiu
AU  - Nan Nan
AU  - Yan Qin
PY  - 2015/07
DA  - 2015/07
TI  - Scheduling design process with workflow for armored vehicle transmission
BT  - Proceedings of the 5th International Conference on Information Engineering for Mechanics and Materials
PB  - Atlantis Press
SP  - 1567
EP  - 1570
SN  - 2352-5401
UR  - https://doi.org/10.2991/icimm-15.2015.288
DO  - 10.2991/icimm-15.2015.288
ID  - Qiu2015/07
ER  -